Data Centers
Sterling, VA
NVA8
45905 Maries Road, Sterling, Virginia 20166
CyrusOne's NVA8 data center in Sterling, VA, boasts state-the-art design and sustainability features in a strategic location.
Located in the highly desired location of Sterling, VA, in Loudin County, CyrusOne's NVA8 data center is one-half mile from CyrusOne's Sterling campus and just seven miles from Dulles International Airport. The 154,230-sq. ft. NVA8 data center offers 24 MW of power and is an ultra-low PUE facility.
The facility features sustainable design including zero-water cooling system, highly efficiency chillers, variable frequency drives, and energy-efficient CRAH units. Comprehensive security includes 24x7x365 monitoring, advanced surveillance, and multi-layer access control systems.
Key Features:
154,230 sq. ft.
Technical IT Space
24 MW
Total Megawatts IT Capacity
Technical Specifications
- 100,341 sq. ft. of raised white floor
- 24 MW critical IT capacity
- CCTV camera system 24×7
- Biometric and photo badge access
- Excellent fiber connectivity
- 10,000-ton air-cooled chiller plant, N+2 configuration
- 225-ton CRAH units, N+2 configuration
- Anti-scale fences and electronic gates
- Secure entry into space via security office
- VESDA early smoke detection
- Double interlock pre-action sprinklers in all critical areas
- Comprehensive surveillance systems
- Multi-layer access controls
- Advanced security monitoring
Sustainability
- Water-Free Cooling
- Minimal water usage for humidification and maintenance
- Highly efficient chillers and variable frequency drives
- Energy-efficient CRAH units
Contact Us
Connect with Our Team for Expert Guidance
Our specialized team is ready to help you navigate the complexities of digital infrastructure. Whether you're expanding globally, optimizing your data center strategy, or looking for sustainable solutions, we'll guide you through every step of your journey.