The Challenge
Hurricane Sandy underscored the need for MultiPlan to find a top-tier data center provider that could house and protect its mission-critical production site. It also needed a redundant and flexible solution that could accommodate the company’s future power and growth needs.
The Requirements
Because the company processes billing and patient information, MultiPlan required:
- A 100% uptime service level agreement.
- Compliance with federal privacy regulations.
- Rigorous physical and logical security.
- A colocation solution that enabled the company to back up its critical IT infrastructure.
- Scalable space and power to accommodate growth.
Collaborating to Build a Custom Solution
CyrusOne took the time to understand MultiPlan’s data center strategy and requirements as well as its culture.
“The transition to CyrusOne’s data center has been flawless,” said Michael Kim, MultiPlan’s chief information officer. “CyrusOne has been very accommodating to our needs and their hands-on approach has made this transition really perfect.”
Learn how CyrusOne provided a solution that allowed MultiPlan to have a contiguous space that would allow for future growth, but remain within its budgetary threshold.
Download the MultiPlan Case Study
Request a complimentary copy of the case study, “MultiPlan Selects CyrusOne for Exceptional Colocation and Flexible Solutions,” and learn more about how your organization can leverage CyrusOne’s flexible, scalable and full redundancy solutions.