Strategically located in Allen, Texas, CyrusOne’s newest Dallas area data center will be 976,000 square foot and contain 580,000 square foot of raised floor/white space at full build out. The facility is purpose-built, offering industry leading efficiencies, the latest cooling technology, uniquely low PUE’s and multilayer security. With over 90 acres, at full build, CyrusOne’s Dallas-Allen campus will be the largest data center campus in Texas.
Water Risk and Use | Now | 2030 Projection | 2040 Projection |
Regional Water Stress | High | High | High |
CyrusOne Water Use | Zero Consumption | Zero Consumption | Zero Consumption |
(Risk assessment and projections based on WRI Aqueduct Tool)
Greenhouse Gases | 2004 | 2007 | 2012 | 2016 | 2018 |
MTCO2/MWh | 0.644 | 0.568 | 0.518 | 0.458 | 0.423 |
Grid Renewables | 2004 | 2007 | 2012 | 2016 | 2018 |
Percent from renewable sources | 1.3% | 2.7% | 8.6% | 14.5% | 18.2% |
This has been increasing about 1.2% points per year over the last 14 years of published data. Based on US EPA eGRID data for the ERCOT subregion (ERCT).
With CyrusOne’s National IX (Internet Exchange), customers can configure a virtual on-net platform from a multitude of carriers and providers, allowing optimal flexibility and interconnection with anyone at any connected facility and to the cloud.
As part of CyrusOne’s National IX platform, this Allen data center provides interconnection to other CyrusOne data centers in Texas and beyond.